Skip to content
NG Operations
Blog

Planning in practice

Articles on sales, material and production planning, bills of materials, quality and data — how the work is organised and how NG Operations makes it faster and more accurate.

  • Quality6 min read

    Certificate of analysis (CoA): what it contains and how it is issued

    Many customers, especially in export, won’t accept goods without a certificate of analysis (CoA) for each lot. What a CoA should contain, where the limits come from, why analysis is done per lot and who approves the document before it goes to the customer.

  • Production planning8 min read

    How to build a production plan: from customer order to a shift on the line

    A production plan answers one question: what gets made, on which line, on which day and in which shift, so the goods are ready for loading. Step by step, with an example: from demand and loading dates, through the bill of materials and material availability, to releasing work orders to the warehouse and comparing plan with actuals.

  • Purchasing7 min read

    Packaging planning in manufacturing: keeping boxes and labels from stopping the line

    When a line stops for lack of material, the culprit is often packaging: a box, a film or a label made for one customer. How to calculate packaging requirements per day from orders and bills of materials, how much minimum stock makes sense, and how to split packaging purchases across suppliers.

  • Sales planning6 min read

    Confirming delivery dates: how to promise customers a date you can keep

    Sales knows what the customer wants, but not whether the packaging will arrive or whether a line has a free shift. Why sales shouldn’t promise a loading date alone, what purchasing, packaging and production check first, and how department sign-offs and the loading plan keep the promise on paper and on the shop floor.

  • Purchasing8 min read

    From MRP proposal to purchase order: pegging, quantities and approval

    An MRP run ends with a proposal, not a purchase order. We explain the four checks in between — cause, quantity, timing and approval — and what happens to the purchase order after it is confirmed, right through to goods receipt.

  • Implementation9 min read

    From Excel to ERP: a phased rollout that doesn’t disrupt the business

    Excel is fast, flexible and practically free — which is exactly why it is so hard to leave. We explain why big-bang rollouts fail more often, how to choose the first area, why data migration is the real project, and what happens to Excel after the switch.

  • Quality7 min read

    Lot traceability and LIMS: quality that doesn’t hold production back

    Traceability is not a folder of paperwork but a data model linking a raw-material lot to a delivery to a customer. The recall test, the role of a LIMS, quality gates — and who does what between the plan, the warehouse and the laboratory.

  • Manufacturing7 min read

    Production KPIs that drive decisions: OEE and what goes with it

    OEE is the most quoted figure on the shop floor and the most often misused — reduced to one number with no breakdown. How to break it down, where to measure it, and which indicators from planning and the warehouse belong next to it.

  • Purchasing8 min read

    How to reduce inventory without stopping production

    Cutting stock evenly across the whole range is the fastest way to run out of the right material while the wrong material keeps sitting in the warehouse. We explain segmentation, safety stock and the levers that free up capital without risking a stoppage.

  • Integrations8 min read

    Why your inventory numbers lie: WMS, ERP and real-time data

    The number in the ERP and the goods on the shelf are rarely the same, and the gap is paid for in stoppages and rush purchases. We explain where the gap comes from, which number really decides what you can promise a customer, and what real-time integration actually involves.

  • AI and automation7 min read

    AI in production planning: where it really helps, and where it doesn’t

    The word AI gets attached to everything, from plain statistics to language models. We separate three different things that go by that name, show where each really adds value — and what AI in NG Operations does and does not do.

  • Manufacturing8 min read

    Bills of materials: the foundation of accurate product cost

    Product cost is only as accurate as the bills of materials and standard quantities behind it. On setting quantities as a share of net mass or per unit, loss and scrap allowances, the gap between standard and actual consumption, versions — and how a small error multiplies.

  • Sales planning7 min read

    Sales forecast accuracy: how to measure it and how to improve it

    “Our forecast is pretty good” is not a measurement. We explain how MAPE, WMAPE, bias and forecast value added measure accuracy, how to turn those measurements into a better next cycle — and what to do when the contract is the forecast.

  • Sales planning8 min read

    S&OP in practice: how sales and production agree on one number

    S&OP is not another meeting but a monthly process that brings sales, production, purchasing and finance to one agreed plan. We walk through the cycle, the roles and the typical mistakes — and how that one number reaches every promise made to a customer.

  • Production planning8 min read

    MRP vs MPS vs APS: what each one does and when you need it

    Three acronyms that software brochures use almost interchangeably, even though they solve three different problems. We explain the order, the inputs and outputs of each layer, and how to tell which one you are actually missing.