Skip to content
NG Operations
Purchasing7 min read

Packaging planning in manufacturing: keeping boxes and labels from stopping the line

When a line stops for lack of material, the culprit is often packaging: a box, a film or a label made for one customer. How to calculate packaging requirements per day from orders and bills of materials, how much minimum stock makes sense, and how to split packaging purchases across suppliers.

In short

  • Packaging stops a line just as raw materials do, and it is harder to substitute: one customer’s box or label can’t be borrowed from another order.
  • Packaging requirements are calculated per day: the order quantity × the quantity per unit from the bill of materials, plus loss and scrap, on the loading date.
  • The shortage is the requirement minus stock, goods in transit, open purchase orders and material already issued, and minimum stock is added deliberately — not for every item.
  • Shared packaging can carry minimum stock, while packaging printed for a customer is better bought against what has actually been contracted.
  • In NG Operations one wizard turns the shortage into purchase orders by supplier and date, and the warehouse is told what is coming.

Short answer: packaging is planned the same way as raw materials, but by exact item code and with more care, because it is harder to substitute. For every customer order, multiply the finished-goods quantity by the packaging quantity per unit from the bill of materials, add the loss and scrap allowance, and you have the requirement on the loading date. Subtract stock, goods in transit, open purchase orders and anything already issued to production; what remains is the shortage to order, plus minimum stock where it makes sense. The shortage then becomes purchase orders by supplier and delivery date, and the warehouse is told what is coming.

Why packaging stops lines so often

Raw materials usually get close attention: they are expensive, visible and discussed at every meeting. Packaging is cheaper and feels secondary — until one morning the line stops for lack of a box, a film or a label. The same reasons keep coming up:

  • Packaging is often customer-specific. A printed box or label for one customer can’t be used for another, so a surplus of one item doesn’t cover a shortage of another.
  • One product uses several packaging items. Primary packaging in contact with the product, a shipping carton, a label, a pallet, stretch film — one missing item is enough.
  • Printed packaging has long lead times. Suppliers need time for artwork and printing, and the minimum print run is often larger than a single order.
  • Designs change. A new label or box version means the old stock is no longer valid, and the new one has to arrive on time.

That is why packaging needs the same routine as raw materials — daily requirement, shortage, purchase order — only with more discipline in the data.

Packaging in the bill of materials: what it must say

Packaging requirements are not typed in by hand; they are calculated from the finished product’s bill of materials. For the calculation to be right, every packaging line needs:

  • the exact item code — that specific box or label, not “some box”;
  • the packaging type — primary, secondary (shipping) or other;
  • the quantity per unit — how much of that packaging goes into one unit of product; it can be a fraction, for example one twelfth of a carton when twelve packs fit into a carton;
  • the loss and scrap allowance — a percentage added to the requirement, because some film and labels are always lost while setting up the machine.

There is an important difference from raw materials here. In NG Operations raw materials are planned by material type, because the same material can be bought under several item codes and the specific code is chosen later. Packaging is planned and ordered by exact item code: a line in the plan is the item you order. So a wrong code in the bill of materials is immediately a wrong purchase order, and a bill of materials without packaging means the plan can’t see the requirement and the shortage falsely reads zero.

How to calculate packaging requirements per day

The requirement comes from what sales has already agreed. For each order: finished-goods quantity × packaging quantity per unit, plus the loss and scrap allowance, rounded up to whole pieces. The requirement falls on the order’s loading date, because the goods must be packed by then.

Besides orders, two more sources are worth looking at:

  • the production plan — production orders not yet completed, with their packaging requirements on the production day;
  • contracts — the part of a contract the customer hasn’t ordered yet, as a long-range view of how much packaging the rest of the contract will need.

The key is never to count the same job twice: an order that already has a production order counts once, and the part of a contract that has been ordered comes in through orders, not through the contract.

From requirement to shortage

The requirement is not yet the quantity to order. Everything that already exists or is on its way is subtracted from it:

shortage = requirement − stock − goods in transit − open purchase orders − already issued to production (+ minimum stock)

An illustrative example with made-up numbers: an order calls for 6,000 packs of finished product for loading on Thursday. Twelve packs fit into a shipping carton, and the loss and scrap allowance for the carton is 2%.

LineCartons
Requirement: 6,000 ÷ 12 = 500, plus 2%510
− in stock300
− in transit between your sites0
− open purchase order (arrives Tuesday)100
− already issued to production for this order0
= shortage110
+ minimum stock, if included150
= to order, including minimum stock260

The same calculation runs for every line in the bill of materials — film, label, pallet — and for every day. Only then can you see that the carton is short for Thursday, not “sometime this month”.

In NG Operations this is the packaging planning screen. A day-by-day calendar shows the purchase orders due to arrive and the shortage still to be ordered, and a table for the chosen period shows requirement, stock, goods in transit, ordered, issued to production, minimum stock and shortage per item, with the largest shortage at the top. Stock comes from the warehouse, and the item card shows a projection: when, based on open documents, the item will run out.

Minimum stock: which packaging needs it

Minimum stock is a buffer against a late supplier or a rush order. For packaging it doesn’t make equal sense for every item:

  • Shared packaging — shipping cartons used by several products, pallets, stretch film — is a good candidate for minimum stock. It is used all the time and doesn’t go out of date.
  • Packaging printed for a customer is risky to hold as stock. If the contract ends or the design changes, you are left with goods nobody needs. It is better bought against what has actually been contracted.

The level of minimum stock shouldn’t be a percentage pulled from thin air: it depends on how late the supplier tends to be and how much consumption varies. General rules for safety stock are covered in Reducing inventory without stoppages.

In NG Operations minimum stock is set on the item or on the item type, and the planner chooses whether it enters the shortage calculation. For primary packaging the system also shows how much may still be bought against the remaining sales contracts, and warns when a purchase order goes beyond that quantity.

Purchasing packaging: one item, several suppliers

Once the shortage is known, it has to become purchase orders. A purchase order goes to one supplier for one delivery date, so it is natural to group lines by supplier and date. It often makes sense to split a single item too: part from the regular supplier, part from another who can deliver faster, or because one supplier alone can’t deliver the full quantity on time.

Every purchase order needs a realistic delivery date, because the plan uses it to work out what arrives when. A purchase order past its delivery date with nothing received is a sign to call the supplier today, not when the line stops.

In NG Operations a purchase planning wizard turns the shortage into purchase orders grouped by supplier and delivery date. An item can be split across several suppliers, and purchasing can cover the whole period or only the needs up to a chosen day. Each purchase order announces the incoming packaging receipt to the warehouse, and received quantities flow back into stock — with NG WMS or another WMS. The supplier card shows each supplier’s delivery history. The details are on the Material requirements planning and Purchasing pages, and what happens between a proposal and a purchase order is explained in From MRP proposal to purchase order.

Packaging and the loading date

Packaging is not only a purchasing matter — it also decides which date can be promised to the customer. If a printed carton arrives only after the requested loading date, that date can’t be met, however free the line is. That is why in NG Operations packaging purchasing has its own sign-off on the customer order: it confirms that packaging is available according to the bill of materials of the ordered products before sales confirms the date to the customer. The whole flow is described in Confirming delivery dates.

It works the other way too: when the loading date moves, the packaging requirement moves with it. An order pushed back by a week pushes back the shortage, so the purchase order needs a second look — so the goods don’t arrive too early or, worse, too late.

Common packaging planning mistakes

  • A product that is sold has no packaging in its bill of materials, so the plan can’t see the requirement.
  • The bill of materials lists a wrong item code or an old design.
  • The loss and scrap allowance is left at zero, although film and labels are wasted during setup.
  • A purchase order has no realistic delivery date, so the plan counts on goods that aren’t coming.
  • Goods have arrived but the receipt hasn’t been recorded, so both stock and open orders are wrong.
  • Minimum stock is held for packaging printed for a single customer.
  • Packaging is left to “someone in raw materials”, so nobody looks at its shortage every day.

A good routine is simple: every morning, look at the shortage for the next few days, order what is missing before the loading reaches the dock, and chase purchase orders that are past their delivery date. How packaging fits into the wider plan is covered in How to build a production plan.

Frequently asked questions

How is packaging planned in manufacturing?

From customer orders and bills of materials: the finished-goods quantity is multiplied by the packaging quantity per unit, the loss and scrap allowance is added, and the requirement falls on the loading date. Stock, goods in transit, open purchase orders and material already issued are subtracted, and the rest is ordered from suppliers.

What is a packaging specification?

The part of the finished product’s bill of materials that says which packaging goes with the product: the exact item code, the type (primary, secondary or other), the quantity per unit of product and the loss and scrap allowance. Without it, the plan can’t see any packaging requirement.

How much minimum stock of packaging should you hold?

It depends on the supplier’s lead time and reliability and on how much consumption varies. Minimum stock makes sense for shared packaging — shipping cartons, pallets, film — while packaging printed for one customer is better bought against contracted quantities.

Why is packaging planned by item code and raw material by type?

The same raw material can be bought under several item codes, so NG Operations plans it by material type and the specific code is chosen later. Packaging, especially printed packaging, isn’t interchangeable: a line in the plan is exactly the item code that gets ordered.

Can one packaging item be ordered from several suppliers?

Yes. In NG Operations the purchase planning wizard groups purchase orders by supplier and delivery date, and a single item can be split across several suppliers, each with its own quantity and date.

How does the warehouse know packaging is on its way?

Each purchase order announces the incoming receipt to the warehouse — NG WMS or another WMS. When the goods arrive, received quantities flow back into NG Operations and into stock, and the purchase order shows what has been received and what is still outstanding.

Want to see how this would look in your production?

In a free consultation and demo we walk through your sales plan, materials and production in NG Operations and show how the plan connects to the warehouse.

More articles

  • Purchasing8 min read

    From MRP proposal to purchase order: pegging, quantities and approval

    An MRP run ends with a proposal, not a purchase order. We explain the four checks in between — cause, quantity, timing and approval — and what happens to the purchase order after it is confirmed, right through to goods receipt.

  • Purchasing8 min read

    How to reduce inventory without stopping production

    Cutting stock evenly across the whole range is the fastest way to run out of the right material while the wrong material keeps sitting in the warehouse. We explain segmentation, safety stock and the levers that free up capital without risking a stoppage.

  • Sales planning6 min read

    Confirming delivery dates: how to promise customers a date you can keep

    Sales knows what the customer wants, but not whether the packaging will arrive or whether a line has a free shift. Why sales shouldn’t promise a loading date alone, what purchasing, packaging and production check first, and how department sign-offs and the loading plan keep the promise on paper and on the shop floor.