Quality6 min read

Certificate of analysis (CoA): what it contains and how it is issued

Many customers, especially in export, won’t accept goods without a certificate of analysis (CoA) for each lot. What a CoA should contain, where the limits come from, why analysis is done per lot and who approves the document before it goes to the customer.

In short

  • A certificate of analysis (CoA) shows, for one lot, what was measured, by which method and against which limit from the customer’s specification.
  • Limits are never written onto a CoA from memory: they come from the customer specification, maintained once as a template and changed in one place.
  • Analysis is done per lot, because the customer receives a specific lot, and the lot links the CoA to production and the warehouse when a complaint comes in.
  • Before it goes to the customer, a CoA passes two steps: verification of the measurements and approval by a responsible person.
  • In NG Operations the CoA is produced from an approved analysis as a PDF in English, with the name of the person who approved it.

Short answer: a certificate of analysis (CoA) is a document that shows, for one lot of a product, which properties were measured, by which method, what the customer’s specification allows and what the result was. To be worth anything, the limits must come from the customer’s specification, the analysis must be done for a specific lot, and the document has to be checked and approved by a responsible person before it is sent. Export customers usually want it in English.

What is a certificate of analysis (CoA)?

Several names are used for the same document — certificate of analysis, CoA, analysis certificate. Whatever it is called, the point is the same: a CoA is evidence of the measured values of one lot. It doesn’t say what the product is in general; it says what was measured on the specific batch going to the customer.

So it shouldn’t be confused with related documents:

  • A product specification says what the customer requires — which properties, within which limits. The CoA says what was measured.
  • A quality-system certificate, for example against an ISO standard, is about the company and its processes, not about one batch.
  • A product declaration describes the product for the market, not the test results of a particular lot.

CoAs are most often requested in food, pharmaceuticals, cosmetics and chemicals. The obligation usually comes from the contract or the customer’s specification, and in regulated industries from regulations as well. Software can make issuing easier and keep everything in one place, but responsibility for compliance stays with the manufacturer.

What a CoA should contain

Customers have their own requirements, but a good CoA almost always has the same parts:

Part of the CoAWhat it containsWhy it matters
Issuerthe manufacturer’s name and addresswho is accountable for the results
Customer and shipmentwho the goods are shipped to, the customer’s purchase order numberthe customer links the CoA to their order
Product and lotproduct name, lot, production date, best-before date, country of originthe CoA applies to that lot only
Resultsparameter, method, specification limit and measured resultthe core of the document: what was measured, and against what
Approvalthe name of the person who approved the results, and the datethe document is an official result, not a draft

Parameters are usually grouped by category — physical-chemical, microbiological, sensory — so the customer quickly finds what they check. Each result should show the method used, because the same parameter measured by different methods doesn’t necessarily give the same number.

Customer specifications: where the limits come from

The same product often goes to different customers with different requirements. One wants a tighter moisture range, another an extra microbiological test, a third a different order of parameters on the document. So limits must never be written onto a CoA from memory or copied from the previous one.

The right place for them is the customer specification, maintained once and stored as a template: a list of parameters, the method for each and the acceptance criterion. Every new analysis for that customer starts from the template, and the lab technician only enters the measured values. When the customer changes a requirement, you change the template — not each CoA — and from then on every new result uses the new limit.

That is how the lab builds results in NG Operations: methods, parameters and categories are master data, a template holds the customer specification, and each analysis is created from a template. The print order of parameters is set in the template, so every customer’s CoA looks the way they expect.

Analysis per lot, not per product

A lot (batch) is a quantity of product made under the same conditions — from the same raw materials, on the same line, in the same shift. Two lots of the same product can differ, which is why a CoA “for the product” is of little value. The customer receives a specific lot and wants results for that lot.

Analysing per lot has another benefit: when a complaint comes in, the lot is the link between the CoA, production and the warehouse. It shows when the goods were made, from what, and who received them. That is why the lot should be assigned in production, not made up when a CoA request arrives. How the lot travels through the production plan is covered in How to build a production plan, and the wider traceability picture in Lot traceability and LIMS.

When a sample goes to an external lab or to the customer, it is worth recording that as well: what was sent, from which lot, how much and to whom. NG Operations keeps a separate sample record for this, apart from the analysis itself.

Pass or fail — and what to do when it fails

Every measured result is compared with the limit from the specification. With the specification in the system, nobody has to do that comparison in their head: a result within the limit is flagged as compliant, one outside it as non-compliant. A parameter can be measured several times, and each measurement is assessed.

The automatic assessment is an aid, not a decision. The technician checks it and sets it by hand where the customer hasn’t given a numeric limit. A non-compliant result should reach the responsible person straight away, and they decide what happens to the goods — rework, another customer, holding the stock or a conversation with the customer. That is a human decision, and it should be made the same day, while the goods are still in the warehouse.

Approval: two steps before a CoA goes out

A CoA is an official document, so it shouldn’t be issued by the same person at the same moment the last value was entered. Good practice has two steps:

  1. Verification — the measurements are complete and the result is final. The values are locked so they can’t be changed quietly.
  2. Approval — a responsible person, usually the lab or quality manager, reviews the result and accepts it as official.

In NG Operations only a verified analysis can be approved, and the approver’s name is printed on the CoA as “Laboratory manager”, with the approval date. Until the analysis is approved, the PDF carries a “DRAFT – NOT APPROVED” mark, so a draft can’t be mistaken for the official document. If an approved result is reopened for a correction, the approval record is cleared and the analysis goes through verification and approval again — a changed document must not carry someone else’s signature. Roles and permissions decide who may verify and who may approve.

CoAs for export customers

An export customer expects the CoA in a language their quality team reads — most often English. Translating the title isn’t enough: parameter names, methods and units should be consistent from one document to the next, or the customer checks every CoA as if it were new.

Besides language, export usually calls for a few more things:

  • the customer’s purchase order number on the CoA, so they can match it to their order;
  • the country of origin, when the customer asks for it;
  • additional references the customer uses in their own system, if required;
  • a PDF sent with the goods or ahead of them, rather than an editable document.

In NG Operations the CoA is issued as a PDF in English, and the results can also be exported to Word or Excel for further processing. Contracts with export customers can carry English text too, so documents for the same customer stay consistent. Shipments run through sales and delivery: the delivery note goes to the warehouse, and shipped quantities come back.

Common CoA mistakes

  • A limit copied from an old CoA, although the customer has since changed the specification.
  • A mistyped lot, so the CoA can’t be linked to the goods in the warehouse or to production.
  • A CoA issued before all measurements are complete.
  • A result without a method, so the customer doesn’t know how it was obtained.
  • A draft sent to the customer as if it were the official document.
  • A non-compliant result discovered only after the goods have shipped.

Each of these mistakes has the same fix: the specification in one place, the lot from production, two approval steps and results that reach the responsible person the same day.

How NG Operations issues a CoA

  1. Master data — methods, parameters and categories are entered once.
  2. Template — a specification for each customer: parameters, method and limit, plus the print order.
  3. Analysis per lot — created from the template; the technician enters the lot, product details and measured values.
  4. Assessment — the system proposes pass or fail against the specification, and the technician confirms.
  5. Verification and approval — two steps, with a record of who approved and when.
  6. Certificate — a PDF in English, ready for the customer.

The lab’s start page shows what is in progress, what is awaiting approval and what is out of specification, and the laboratory dashboards add an overview. Everything is described on the Laboratory quality control page.

Frequently asked questions

What is a certificate of analysis (CoA)?

A certificate of analysis (CoA) is a document that shows, for one lot of a product, the measured parameters, the test method, the limit from the customer’s specification and the result. It travels with the goods to the customer as evidence of the quality of that specific batch.

What must a certificate of analysis contain?

The issuer, the customer and their purchase order number, the product name, lot, production date and best-before date, the country of origin where required, then the method, limit and result for each parameter, and finally the name of the person who approved the results, with the date.

What is the difference between a specification and a CoA?

A specification says what the customer requires — which parameters, within which limits. A CoA says what was measured on a specific lot. The specification is maintained once per customer, while a CoA is issued for every lot.

Who signs a certificate of analysis?

Usually the lab or quality manager, after reviewing the results. In NG Operations an analysis is first verified and then approved, and the approver’s name is printed on the CoA as “Laboratory manager”.

Can the CoA be issued in English?

Yes. In NG Operations the certificate of analysis is issued as a PDF in English, which is what export customers most often ask for.

Is a CoA issued for every shipment?

A CoA is issued per lot, for the customer receiving it. If a shipment contains several lots, a CoA for each of them goes with it.

Want to see how this would look in your production?

In a free consultation and demo we walk through your sales plan, materials and production in NG Operations and show how the plan connects to the warehouse.

More articles

  • Quality7 min read

    Lot traceability and LIMS: quality that doesn’t hold production back

    Traceability is not a folder of paperwork but a data model linking a raw-material lot to a delivery to a customer. The recall test, the role of a LIMS, quality gates — and who does what between the plan, the warehouse and the laboratory.

  • Production planning8 min read

    How to build a production plan: from customer order to a shift on the line

    A production plan answers one question: what gets made, on which line, on which day and in which shift, so the goods are ready for loading. Step by step, with an example: from demand and loading dates, through the bill of materials and material availability, to releasing work orders to the warehouse and comparing plan with actuals.

  • Purchasing7 min read

    Packaging planning in manufacturing: keeping boxes and labels from stopping the line

    When a line stops for lack of material, the culprit is often packaging: a box, a film or a label made for one customer. How to calculate packaging requirements per day from orders and bills of materials, how much minimum stock makes sense, and how to split packaging purchases across suppliers.